PCN Assembly/Origin | Assembly Site Add Rev 27/Oct/2015 Assembly Site Addition Rev 8/Dec/2015 AMKOR 02/Aug/2016 |
---|---|
EDA / CAD Models | Download from Accelerated Designs |
PCN Other | BOM/Assembly Site Updates 03/Dec/2014 |
PCN Design/Specification | Assembly Site Add 22/Oct/2015 |
Datasheets | LM139,239,339(A), LM2901(AV,V) |
Online Catalog | Comparators - 4+ elements |
Featured Product | Create your power design now with TI’s WEBENCH® Designer |
ECCN | ECL99 |
Supplier Stock
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 61048 | Update On 2025-04-15 |
---|---|---|
Lead-Time | 5-7days | |
SPQ/MOQ | 2500/1000 | |
Location | -- | |
DateCode | 5年内 |
Supplier Code:SP1036
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
See more prices
1+ | $0.13865 |
---|---|
50+ | $0.09565 |
1250+ | $0.08696 |
2500+ | $0.07889 |
stock | 7374 | Update On 2023-06-01 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 2500/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1027
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
See more prices
2500+ | $0.15764 |
---|---|
5000+ | $0.13563 |
10000+ | $0.13423 |
12500+ | $0.12958 |
25000+ | $0.12679 |
stock | 2500 | Update On 2023-06-01 |
---|---|---|
Lead-Time | 6Weeks | |
Supplier SPQ/MOQ | 2500/2500 | |
Location | -- | |
DateCode | 2311 |
Please enter the verification code in the image below: