LM293DGKR | ||
---|---|---|
|
||
|
||
Product description : IC COMPARATOR DIFF DUAL 8VSSOP | ||
SPQ:2500 | ||
Datasheet : -- |
Voltage - Supply, Single/Dual (±) | 2 V ~ 36 V, ±1 V ~ 18 V |
---|---|
Package / Case | 8-TSSOP, 8-MSOP (0.118", 3.00mm Width) |
Voltage - Input Offset (Max) | 5mV @ 30V |
Part Status | Active |
Manufacturer | Texas Instruments |
Family | Linear - Comparators |
Mounting Type | Surface Mount |
Current - Quiescent (Max) | 2.5mA |
Packaging | Cut Tape (CT) |
Type | Differential |
Supplier Device Package | 8-VSSOP |
Current - Input Bias (Max) | 0.25µA @ 5V |
Category | Integrated Circuits (ICs) |
Output Type | CMOS, MOS, Open-Collector, TTL |
Current - Output (Typ) | 20mA |
Operating Temperature | -25°C ~ 85°C |
Number of Elements | 2 |
Supplier Stock
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
stock | 40 | Update On 2025-05-13 |
---|---|---|
Lead-Time | 5-7days | |
SPQ/MOQ | 2500/5 | |
Location | -- | |
DateCode | 3年内 |
Supplier Code:SP1039
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
See more prices
1+ | $0.28314 |
---|---|
100+ | $0.19305 |
250+ | $0.14872 |
1000+ | $0.09867 |
stock | 1005873 | Update On 2024-10-04 |
---|---|---|
Lead-Time | 1Weeks | |
Supplier SPQ/MOQ | 1/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1036
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
See more prices
1+ | $0.14419 |
---|---|
100+ | $0.09622 |
1250+ | $0.08741 |
1250+ | $0.08741 |
stock | 1815 | Update On 2024-06-26 |
---|---|---|
Lead-Time | -- | |
Supplier SPQ/MOQ | 2500/1 | |
Location | -- | |
DateCode | -- |
Supplier Code:SP1027
Offline Manufacture or Manufacture authorized supplier owned stock and price , need double confirmation and share out from them
2500+ | $0.15066 |
---|---|
10000+ | $0.1395 |
25000+ | $0.12803 |
stock | 7500 | Update On 2024-10-04 |
---|---|---|
Lead-Time | 6Weeks | |
Supplier SPQ/MOQ | 2500/2500 | |
Location | -- | |
DateCode | 2429 |
Please enter the verification code in the image below: